Services

We provide high-quality and professional services in accordance with the highest standards, from planning through to final handover.

We provide services with high quality and professionalism.

And according to the highest standards starting from

Planning and even final delivery

S1 12

Building Construction 

S1 13

Excavation and backfilling works

S1 15

Metal Building Construction

S1 14

Infrastructure works

_

Stages

R83

Study Phase

Study Phase
Initially, Eamar Steel studies and reviews the engineering drawings through the company’s technical office before execution, in order to identify the design loads and review the structural system designated for the project. If any design errors or inconsistencies between the actual loads and the drawings are observed, the supervising engineering office or the owner is notified, and the appropriate technical proposal is submitted to the owner or consultant.
968

Implementation phase

Implementation phase
The company specializes in the construction of commercial towers, hospitals, hotels, residential buildings, government buildings, and steel works, under the continuous supervision of the company’s technical office. The company employs qualified technical and professional teams to complete all works in accordance with the required specifications, standards, and quality requirements of the supervising authority. The company also relies on hydraulic equipment alongside its workforce to accelerate work progress and ensure site safety and security.
R83

Stage of study

Study Phase
Initially, Imar Steel conducts a study and testing of the engineering plans through the company's technical office before their implementation, understanding the design loads, reviewing the relevant system for the project, and directing the supervising engineering office or the owner if any design errors or inconsistencies in the actual loads are observed, providing the appropriate proper suggestion to the owner or consultant.
968

Implementation phase

Implementation phase
The company specialises in the construction of commercial towers, hospitals, hotels, residential buildings, and government buildings, as well as mining works under the continuous supervision of the company's technical office. It employs the best technical and professional staff to complete all work according to the specifications, standards, and quality criteria of the supervising authority. The company relies on hydraulic equipment alongside human resources to speed up work and ensure safety and security.
_

Post-Tension

 

Post-Tension System

After reviewing and studying the client’s drawings, if the design load is found to be insufficient, the company proposes increasing the slab’s design load by modifying the structural system and using the Post-Tension Slab System. The company has extensive experience in this system, having executed several projects using it and providing a 10-year warranty.

 

Post-Tension System

The company acts after reviewing the client's plans and studying them.

If the design load imbalance becomes apparent

We will follow up on the proposal with the client to increase the design load of the slab through

Changing the structural system of the slab and using the Postension Slab system. We also have previous experience in this system, having executed several projects and implemented it for a duration of 10 years.