Iconic Autos Project

_

Iconic Autos Project

_

In the heart of Khamis Mushait, stands out Iconic Autos Complex

As a sophisticated destination for lovers of excellence in the world Car rental

In the heart Thursday morning

 It stands out Iconic Autos Complex

As an elegant destination for lovers of excellence in the world Car rental

Project siteKhamis Mushait - Al Khalidiyya
Project activityCar Rental Complex
Project phaseCompleted
Project ContractorEmaar Steel Company

 Project Location

 Khamis Mushait – Al-Khalidiyah

 

 Project Activity

 Car Rental Complex

 

 Project Phase

 Under Construction

 

 Project Contractor

 EAMAR STEEL Company

 

_

Project Stages

_
Waterproofing
95

Completion Percentage

Zinc Installation and Rainwater Drainage
95

Completion Percentage

Parapet Works
100

Completion Percentage

Metal Tubes
100

Completion Percentage

Upper Tie Beam
100

Completion Percentage

Columns and Masonry Works up to 6.5 m.
100

Completion Percentage

Tie Beam
100

Completion Percentage

Columns and Masonry Works up to 3 m.
100

Completion Percentage

Floor Slab Casting
100

Completion Percentage

Steel Beams
100

Completion Percentage

Grade Beam Backfilling
100

Completion Percentage

Steel Columns
100

Completion Percentage

Reinforced Grade Beams
100

Completion Percentage

Backfilling and Compaction
100

Completion Percentage

Reinforced Footings and Column Necks.
100

Completion Percentage

Plain Concrete Footings
100

Completion Percentage

Excavation
Soil Testing

Soil testing is one of the most important foundational stages in any construction project. Completing it at 100% in the Iconic Autos Project means that the project has started on solid and reliable foundations. Here is a full breakdown:


What Are Soil Tests?

It is an analytical study of the soil at the project site before starting any construction works. Its purpose is to determine the soil’s bearing capacity and identify the appropriate type of foundations.


Common Tests Usually Conducted.

First – Field Tests (On-Site): They include drilling exploratory boreholes to identify the soil layers, conducting the Standard Penetration Test (SPT) to determine soil resistance, and performing a groundwater permeability test, if groundwater is present.

Second – Laboratory Tests (On Samples): They include determining the moisture content, the California Bearing Ratio (CBR), classifying the soil according to engineering specifications, and detecting the presence of salts or sulfates that may damage the concrete.


Its Importance Specifically in the Iconic Autos Project.

A car rental complex project requires:

  • Floors capable of bearing heavy loads. from cars and equipment.
  • Suitable foundations. compatible with the soil characteristics of Al-Khalidiyah area in Khamis Mushait.
  • Effective rainwater drainage. which is related to soil permeability.

What does completing it at 100% mean?

It means that the engineering team obtained the full soil report and based the foundation design on it. This is reflected in the following stages, such as the plain concrete footings, which were also fully completed, indicating a proper sequence in the project execution.