Iconic Autos Project
Iconic Autos Project
In the heart of Khamis Mushait, stands out Iconic Autos Complex
As a sophisticated destination for lovers of excellence in the world Car rental
In the heart Thursday morning
It stands out Iconic Autos Complex
As an elegant destination for lovers of excellence in the world Car rental
Project Location
Khamis Mushait – Al-Khalidiyah
Project Activity
Car Rental Complex
Project Phase
Under Construction
Project Contractor
EAMAR STEEL Company
Project Stages
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage
Completion Percentage


Completion Percentage


Completion Percentage
Soil testing is one of the most important foundational stages in any construction project. Completing it at 100% in the Iconic Autos Project means that the project has started on solid and reliable foundations. Here is a full breakdown:
What Are Soil Tests?
It is an analytical study of the soil at the project site before starting any construction works. Its purpose is to determine the soil’s bearing capacity and identify the appropriate type of foundations.
Common Tests Usually Conducted.
First – Field Tests (On-Site): They include drilling exploratory boreholes to identify the soil layers, conducting the Standard Penetration Test (SPT) to determine soil resistance, and performing a groundwater permeability test, if groundwater is present.
Second – Laboratory Tests (On Samples): They include determining the moisture content, the California Bearing Ratio (CBR), classifying the soil according to engineering specifications, and detecting the presence of salts or sulfates that may damage the concrete.
Its Importance Specifically in the Iconic Autos Project.
A car rental complex project requires:
- Floors capable of bearing heavy loads. from cars and equipment.
- Suitable foundations. compatible with the soil characteristics of Al-Khalidiyah area in Khamis Mushait.
- Effective rainwater drainage. which is related to soil permeability.
What does completing it at 100% mean?
It means that the engineering team obtained the full soil report and based the foundation design on it. This is reflected in the following stages, such as the plain concrete footings, which were also fully completed, indicating a proper sequence in the project execution.