Iconic Autos Project
Iconic Autos Project
In the Heart of Khamis Mushait, Iconic Autos Complex Stands Out as a Premium Destination for Those Who Seek Excellence in the World of Car Rental
In the Heart of Khamis Mushait
Iconic Autos Complex Stands Out
as a Premium Destination for Those Who Seek Excellence in the World of Car Rental
Project Phases
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز


نسبة الانجاز


Completion Percentage

Excavation and Backfilling Works
Soil Testing
Soil testing is one of the most important foundational stages in any construction project. Completing this stage 100% in the Iconic Autos Project means that the project started on solid and reliable foundations.
What is Soil Testing?
Soil testing is an analytical study of the soil at the project site before starting any construction work. Its purpose is to determine the soil’s ability to bear the building loads and identify the most suitable type of foundations.
Tests Usually Conducted
First – Field Tests
- Drilling exploratory boreholes to identify soil layers.
- Conducting the Standard Penetration Test (SPT) to determine soil resistance.
- Testing groundwater permeability if present.
Second – Laboratory Tests
- Determining moisture content.
- Testing the California Bearing Ratio (CBR).
- Classifying the soil according to engineering standards.
- Detecting salts or sulfates that may affect concrete.
Its Importance in the Iconic Autos Project
A car rental complex requires:
- Floors capable of bearing heavy loads from vehicles and equipment.
- Suitable foundations compatible with the soil nature of Al Khalidiyah area in Khamis Mushait.
- Effective rainwater drainage, which is directly related to soil permeability.
What Does 100% Completion Mean?
It means that the engineering team has obtained the complete soil report and based the foundation design on it. This is reflected in the following stages, such as the blinding concrete works, which were also fully completed, indicating a proper sequence in project execution.
Hello World ...
Hello World ...
Hello World ...
Hello World ...
Hello World ...
Hello World ...
Hello World ...
Hello World ...
Hello World ...
Hello World ...
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز
نسبة الانجاز


نسبة الانجاز


نسبة الانجاز
Soil Testing
Soil testing is one of the most important foundational stages in any construction project. Completing this stage 100% in the Iconic Autos Project means that the project started on solid and reliable foundations.
What is Soil Testing?
Soil testing is an analytical study of the soil at the project site before starting any construction work. Its purpose is to determine the soil’s ability to bear the building loads and identify the most suitable type of foundations.
Tests Usually Conducted
First – Field Tests
Drilling exploratory boreholes to identify soil layers.
Conducting the Standard Penetration Test (SPT) to determine soil resistance.
Testing groundwater permeability if present.
Second – Laboratory Tests
Determining moisture content.
Testing the California Bearing Ratio (CBR).
Classifying the soil according to engineering standards.
Detecting salts or sulfates that may affect concrete.
Its Importance in the Iconic Autos Project
A car rental complex requires:
Floors capable of bearing heavy loads from vehicles and equipment.
Suitable foundations compatible with the soil nature of Al Khalidiyah area in Khamis Mushait.
Effective rainwater drainage, which is directly related to soil permeability.
What Does 100% Completion Mean?
It means that the engineering team has obtained the complete soil report and based the foundation design on it. This is reflected in the following stages, such as the blinding concrete works, which were also fully completed, indicating a proper sequence in project execution.















